Ice CreamProduction Line Process - Iran
In this project first, 10-ton tanks were installed, and in the next step, a blender was built to mix milk with dry ingredients. Since the milk must be heated at this stage and after mixing completely, it should be transferred to the pasteurizer with the help of a milk pump. Therefore, a fully automatic pasteurizer with Alfa Laval brand pneumatic valves was also equipped. It should be noted that Siemens brand and SCADA WinCC have been used to implement PLCs.
1. Employer
Pajan Dairy Company
4. Production Capacity
5 tons per hour
2. Implementation Time
6 months
5. Implementation Cases
Installation and Industrial Automation
3. Year
2018
6. Country
Tehran, Iran